CarsVansandBikes.com logo
CarsVansandBikes.com logo
2019 FORD FIESTA for sale

2019 Black Ford Fiesta available in Wolverhampton for £8,499.

Ford Fiesta

1.1 Zetec 3dr

Last Service Jan 26
£8,499
Added on 25/06/2026
share
transmission Manual
engine Petrol Engine
mileage12,477 Miles
first registrationMarch 2019
Black
doors 3
Check availability
This 2019 Ford Fiesta Ti-VCT Zetec presents an exceptional opportunity with its remarkably low mileage of just 12,477 miles, making it a standout choice for its age. Powered by an efficient 1.1L Petrol engine and meeting Euro 6 emission standards, this Zetec trim model offers a blend of economy and performance. It comes with a 3 month warranty for your peace of mind, and a full 12 months MOT will be provided upon purchase, ensuring its roadworthiness. The vehicle benefits from partial service history, with its last service recorded at 10,872 miles on 16th January 2026. The Ford Fiesta Ti-VCT Zetec is designed to be cost effective, highlighted by its low insurance group and low CO2 emissions. These factors indicate that this particular Fiesta is likely to be more economical to own and run compared to many other vehicles in its class. This combination of low mileage, efficient engine, and cost saving features makes it a very attractive proposition for any buyer seeking a reliable and affordable hatchback.
Spec
Costs
MOT
Info
Bio
Technical
Engine size
1084 cc
Fuel
PETROL
Transmission
Gearbox
MANUAL
General
No. of Doors
3
General Spec
12v Accessory Socket In Centre Console
2 Usb Ports
3 Spoke Leather Trimmed Steering Wheel With Audio Control
60/40 Split Folding Rear Seat
Adjustable Head Restraints
Automatic Headlights
Auxiliary Input Socket
Bluetooth System
Body Colour Bumpers
Body Colour Door Handles
Body Colour Electric Adjustable Heated Door Mirrors With Integral Indicators
Body Colour Rear Spoiler
Boot Carpet
Chrome Beltline Trim
Chrome Inner Door Handles
Cloth Upholstery
Cornering Front Fog Lights
Dab Digital Radio
Electric Front Windows/one Touch Facility
Electric Power Steering
Footwell Illumination
Ford Easy Fuel
Front Map Reading Lights
Front Seat And Rear Pockets
Halogen Projector Style Headlights With Static Cornering Lights + Led Daytime Running Lights
Height Adjustable Driver's Seat
Quickclear Heated Windscreen
Rear Wiper
Steering Wheel Mounted Controls
Tinted Glass
Trip Computer
Upper Front Grille Chrome Surround
  • X
  • Facebook
  • Google
  • Instagram
  • LinkedIn

CarsVansandBikes Limited is registered in Scotland (Company no.: SC675014). Registered Office: 38 Thistle Street, Edinburgh, EH2 1EN.

CarsVansandBikes Limited. All Rights Reserved.

CarsVansandBikes Logo